800-821-7273 It's Time to Pump Smarter

Case Study: Water Transfers

 

A leading natural gas producer in the Marcellus Shale was fined after a rental company spilled produced water on the ground during a frac water-transfer project.

The company needed pumps that could transfer water at 100 barrels-per-minute  from a 125 unit tank farm to the work tanks 500ft away.

The water transfer used two PowerPrime DV325c diesel pumps and a pressure transducer to automatically shut off pumps if unwanted pressure built up. The project was completed successfully and spill-free.