Case Study: Crude Oil Pipeline

 

A major pipeline owner planned expansion to one of its largest crude oil pipelines in the U.S. The owner needed to bypass the segment that would be built, without disturbing the oil supply for refineries.

The pipeline contractor hired to build the expansion chose four 12-inch DV325c PowerPrime pumps to more than 9 million gallons of flows needed to keep the crude oil pipeline in service during construction.

PowerPrime’s high performance pumps were critical to a positive customer experience and a 100% spill-free bypass.  