Case Study: Coal Plant Turnaround

 

A West Virginian hydrocleaning contractor needed assistance during a three-stage turnaround of a coal power plant. Filtration was needed for the ash from the fire-side hydrocleaning project.

A PowerPrime DV150c pumped chitosan polymer laden water through a media filtration system.

Over the course of the cleaning, the plant owner was able to reduce their cleaning water consumption from 1.5 million gallons to 150,000.

Used on this project: